A contractor who collects all payment at completion is financing the client's project with their own cash. A contractor who collects nothing upfront is taking all the client's risk. Here's the payment structure that balances both.

The standard three-payment structure

  • Deposit (33%): Due on contract signing. Covers material procurement and your first week of labor. Non-refundable after materials are ordered.
  • Progress payment (33%): Due at a defined milestone (e.g., rough-in complete, halfway through project). Tied to measurable work completed.
  • Final payment (33%): Due at substantial completion and client walkthrough. Not before — use the walkthrough as the trigger.

Adjusting for job size

  • Under $5,000: 50% deposit, 50% on completion. Simple, standard for small jobs.
  • $5,000–$25,000: 33%/33%/33% or 40%/30%/30%. Three payments works well.
  • $25,000–$100,000: Monthly billing tied to % of work completed. Bill every 2–4 weeks based on a schedule of values.
  • Over $100,000: AIA-style schedule of values with monthly draws. Get an attorney to review your contract.

Why milestone payments beat date-based payments

Date-based: "25% on the 15th." Problem: if the project runs behind, you get paid before the work is done — or after the work is done. Milestone-based: "25% when subfloor is complete." You control the trigger by completing the milestone. No milestone = no payment request.

What to include in your payment terms

  • Specific deposit amount in dollars (not just percentage)
  • Exact milestone trigger for each progress payment
  • Payment method (check, card, ACH) — specify who pays processing fees if card
  • Payment due date from invoice (Net 7, Net 15 — not Net 30 for residential)
  • Late payment fee: "1.5% per month after [due date]" — include it, enforce it selectively

The deposit conversation

If a client pushes back on a deposit: "The deposit covers the cost of materials before I can start. I order your specific materials from the supplier when the contract is signed — I can't do that without the deposit." This is factual, reasonable, and ends the negotiation.

How to collect faster

  • Include an online payment link in every invoice — card and ACH both accepted
  • Send the invoice the day the milestone is reached, not at the end of the week
  • Follow up on unpaid invoices at 3 days overdue with a friendly reminder, 7 days with a call

ConstruMate generates invoices from your approved estimate in one click — with online payment via Stripe built in. Try it free.

Collect payments faster on every job →

Build your first estimate in 5 minutes

ConstruMate — AI estimates + bilingual proposals

Try it free →
ConstruMate

Stop losing bids to slow estimates.

ConstruMate generates professional proposals in minutes — with AI assist, bilingual EN/ES output, and e-sign built in.

7-day free trialAI estimate in secondsNo credit card needed
Start free — no credit card